Enhancing Communal Living: SureSet Resin Bound Access Roads in Fordingbridge.
Background:
Dorrington Homes, a renowned developer in the residential sector, undertook a project to enhance the access roads within a communal residential area. The project aimed to provide durable, aesthetically pleasing access roads that align with modern sustainability standards.
Project Overview:
Client: Dorrington Homes
Location: Communal residential area
Surface Material: SureSet resin bound natural aggregate, specifically 6mm Barley Butter
Surface Area: 335m²
Base Preparation: Tarmac base prepared according to SureSet's specifications
Aggregate Supplier: Long Rake Spar, supplied by SureSet
Installation: Carried out by SureSet Approved Legacy Installers
This case study delves into the successful execution of a project for Dorrington Homes, involving the surfacing of a communal residential area. The chosen material, SureSet resin-bound natural aggregate in the 6mm Barley Butter blend, covered an extensive area of 335m². The project adhered to SureSet's specifications, including the meticulous preparation of the tarmac base. Long Rake Spar, a supplier partnered with SureSet, provided the necessary aggregates for the project. Installation was seamlessly carried out by SureSet Approved Legacy Installers, ensuring quality and precision throughout the process.
Challenges:
The access roads needed to withstand frequent use and varying weather conditions, necessitating a durable surfacing solution. Maintaining the aesthetic appeal of the residential area was crucial to ensure residents' satisfaction and the overall visual harmony of the neighbourhood. Adhering to SureSet's specifications for base preparation and material application was vital to guarantee the longevity and performance of the access roads.
Solution:
Dorrington Homes opted for SureSet resin-bound natural aggregate in 6mm Barley Butter, known for its durability, low maintenance requirements, permeability, and aesthetic versatility. The choice of Barley Butter complemented the surrounding environment and also provided a warm and inviting appearance to the access roads.
Execution:
The existing tarmac base was meticulously prepared according to SureSet's guidelines, ensuring a stable foundation for the resin-bound aggregate. Long Rake Spar's aggregates, stocked by SureSet, were chosen to meet quality standards and ensure compatibility with the resin-bound system. SureSet executed the installation with precision and efficiency, following recommended techniques to achieve optimal results.
Results:
The implementation of SureSet resin bound access roads yielded several benefits:
Durability: The access roads now offer enhanced durability, capable of withstanding heavy foot traffic and vehicular loads, ensuring long-term performance.
Aesthetic Enhancement: The Barley Butter aggregate blend seamlessly integrates with the surroundings, elevating the visual appeal of the communal residential area.
Sustainability: SureSet's resin-bound system promotes sustainability by minimising material wastage, reducing the need for frequent maintenance, and supporting eco-friendly practices.
Conclusion:
Through detailed planning, adherence to specifications, and collaboration with trusted partners, Dorrington Homes successfully transformed the communal access roads, providing residents with a durable, aesthetically pleasing, and sustainable solution. The project stands as a testament to the effectiveness of SureSet resin-bound systems in enhancing communal living spaces while meeting stringent quality and performance standards.
Enquire