Background
This project forms part of an ongoing re-generation scheme of 85 acres of land which surround Wembley stadium. J P Dunn was the external works sub contractor, which included the arrangement of the supply, and installation of SureSet resin bound paving.
Architects PRP aimed to create a communal courtyard and matching footways, whilst ensuring that environmental sustainability and accessibility standards were achieved, allowing wheel chair users the opportunity to enjoy the tranquil surroundings.
Solution
6mm Beach Urban Pedestrian Mix along with 3mm Danish Pearl was laid on to the recommended asphalt base, edged with granite setts, for the pathways and communal areas. 10mm Barley Beach was then used for the tree pits allowing air and water to permeate through the surface directly to the tree roots.
Result
The end result is a stunning landscape which will help to provide the community with an environmentally friendly, sustainable surface, which for many years to come, will enhance the space designated for family activities and socialising.